Feature · Bills of materials
The bill of materials your shop floor actually follows.
Multi-level trees with sub-assemblies, phantom groupings, per-line yield, alternates, and versioning. The BOM you build is the BOM production runs against and the BOM traceability resolves. One source, end-to-end.
Tree
LIP-RNO · 1 unit ├── BASE-VLV (sub) 0.72 g │ ├── WAX-CRN 0.30 g │ ├── OIL-JOJ 0.40 g │ └── FRG-V01 0.02 g ├── PIG-IOR 0.20 g ├── TUB-BLK 1 ea ├── CAP-BLK 1 ea ├── P-LABEL-SET ⟨p⟩ 1 pack └── BOX-LIP 1 ea
Rolled up
Structure
A BOM is a tree. Stokka keeps it that way.
Most products aren't made in one step. A base formulation is mixed, held briefly, then filled into tubes. A tablet has a pre-mix that has its own pre-mix. Flattening that to a single list of raw materials hides the runs you actually schedule.
Stokka treats every sub-assembly as its own BOM with its own production cycle, stock position, and traceability lineage. The tree explodes recursively for live cost roll-up and where-used, and "What can I build?" checks stock at every level and names the exact bottleneck component, so you never plan a base run for base you already have.
When a sub-assembly shouldn't stand alone in the tree (a hardware pack, a pre-mix that's always made in-line), flag it as a phantom so the structure reads the way your shop thinks. Planning pass-through for phantoms arrives with the forecast-netting layer on the roadmap.
LIP-RNO · 1 unit yield 98% ├── BASE-VLV · 0.72 g (sub) sub-assembly │ ├── WAX-CRN · 0.30 g yield 99% │ ├── OIL-JOJ · 0.40 g yield 98% │ └── FRG-V01 · 0.02 g ├── PIG-IOR · 0.20 g yield 97% │ alt: PIG-IOR-B · 0.20 g x 1.00 ├── TUB-BLK · 1 ea ├── CAP-BLK · 1 ea ├── P-LABEL-SET · 1 pack phantom │ ├── LBL-LIP · 1 ea │ └── LBL-BATCH · 1 ea └── BOX-LIP · 1 ea
Capabilities
The fields that make a BOM useful at 2pm on a Wednesday.
Depth
Unlimited levels
Nest sub-assemblies as deep as the physical manufacturing steps. Cost roll-up and 'What can I build?' explode the whole tree in one pass.
Phantoms
Group without cluttering the plan
Bundle components on paper for readability. Planning ignores the wrapper and works straight off the real parts underneath.
Yield
Per-line yield and loss
Each component takes its own yield percentage. Stokka inflates the issue quantity so planned consumption matches real consumption.
Alternates
Approved substitutes with conversions
When the primary supplier is short, flag the approved alternate with its conversion factor. Purchasing knows both options instantly.
Versioning
Effective dates and change reason
Every BOM change carries a version number, effective date, and reason. Runs reference a specific version so audits resolve cleanly.
UOMs
Canonical units + boundary conversion
Purchasing in drums, stock in kilograms, consumption in grams, one path between them. No 1000x errors reaching the floor.
Costing
Cost roll-up through the tree
Component cost flows up. See margin per finished SKU, and spot which sub-assembly is driving it when prices move.
Packaging
Packaging as BOM lines
Cartons, labels, leaflets, sleeves are all planned and traced. You won't run out of boxes on a Friday.
Traceability
Runs reference the version
A production run is tied to a specific BOM version. The March batch and the July batch can carry different BOMs with clear audit lineage.
Version control
Changes that survive months of operating.
A BOM that changes without discipline becomes a BOM that can't be audited. Stokka records every change with the context that makes it defensible a year later.
v3
2026-04-12
Swap PIG-IOR primary lot supplier from Pigments Direct to Cellini Pigments
Lead-time regression from primary. Alternate already on approved list.
— Niamh O'Brien
v2
2026-02-28
Increase WAX-CRN yield from 97 → 99% after process change
Transfer losses fell after new heated hopper installation in Dublin.
— Órla Bergin
v1
2025-11-03
Initial BOM released
Product launch. Validated against pilot batch ASM-00007.
— Niamh O'Brien
Under the hood
What the BOM is doing the moment a demand signal lands.
Related reading
Go deeper.
- Bills of materials
How to build a bill of materials (step by step)
A bill of materials is the spine of any production operation. Here is how to build one that captures real-world yield, sub-assemblies, and the operator-friendly detail that keeps the floor running.
- Bills of materials
Multi-level BOMs vs single-level: when you need each
A single-level BOM is simpler. A multi-level BOM is honest. Here is a practical guide to when to use each, how they behave in MRP, and the operational cost of getting it wrong.
- Bills of materials
Phantom BOMs: why they exist and when to use them
A phantom BOM is a grouping that exists in the data model but never as physical stock. Used well, it keeps your BOMs readable. Used badly, it hides quantities from MRP. Here is the test.